Worked examples

Two pieces of work,
and what each one changed

Every one of these is real. No client is named and no figure from a client document appears. Where a number carried the argument it has been replaced by the proportion or the direction.

A distressed credit fund, Venezuelan sovereign and state oil paper

The month the families
started leaving

A heavy crude upgrader in eastern Venezuela.

A US carrier group was standing off the Venezuelan coast and Washington was tightening the pressure on Caracas. Our client held Venezuelan government and PDVSA bonds, whose value turned on one question: who would be running the country by March.

Venezuela: three readings, October 2025 to January 2026EchoFrame intelligence. Higher means more risk.Oct 2025Nov 2025Dec 2025Jan 20262 Dec, our call3 Jan, Maduro takenUS pressure on CaracasArmed forces breakingSplit in Maduro’s circle32 days
EchoFrame intelligence, produced by our Venezuela desk. The three readings are tracked separately rather than merged into one score, and each point uses only what was known on or before that date.

The question the client brought was not whether the government would survive. It was who would be running Venezuela in six months, and whether that government would keep paying the country’s debts and honour the contracts signed by the one before it.

Through the second half of November the same pattern kept arriving from sources that do not usually agree and were not talking to each other. Families of senior officials crossing the western border into Colombia. Ministries in Caracas destroying records. Senior figures preparing somewhere to go in the south, towards the Brazilian border. None of it would have cleared our bar alone. Together, from independent channels, it did.

What mattered was the gap between the three readings. US pressure on Caracas was climbing and jumped again in the last week of November. The circle around Maduro had held together all autumn and began to come apart at the start of December. The armed forces went the other way entirely, and on the day we made the call they looked more likely to stay with him than at any point we had measured.

Our judgement was that the army could not hold that line with Washington pressing on one side and Maduro’s own circle splitting on the other, and that when it broke it would break fast. That is why we called a sudden rupture rather than a slow decline.

The signs were on the table ninety days out. We made the final call on 2 December, thirty two days before it happened. Maduro was taken on 3 January. The successor came from inside the ruling coalition, the armed forces stayed intact, and the contract and counterparty assumptions the client had made held.

The client had asked one question: would Maduro still be in power by a given date. We gave them our answer on 2 December, they bought while the market was still pricing collapse, and they made a substantial margin on the debt when the succession held.

Consensus in the press was collapse or the opposition taking power. The client positioned for succession inside the existing structure.

A US oil major, and the plant where its cargo loads

The train was hit.
Proving it took three days

EchoFrame thermal detection over Ras Laffan, Qatar, 18 March 2026: four heat signatures on the production side, none at the tanks or the jetties.

On the morning of 18 March 2026 two drones struck Ras Laffan, the LNG complex on the Qatari coast north of Doha. The wires said an energy facility had been hit. Our client loads its cargoes there and needed to know which part of the site was damaged.

Rapid assessment, March 2026. Seventy two hours from the first report to a sourced answer.

Four lines of evidence converging inside seventy two hoursHuman reporting from the joint venture partner, thermal imagery, satellite passes and AIS vessel tracking, all resolving to the same conclusion: the train identified and the damage established.FOUR LINES, NONE OF THEM SUFFICIENT ALONEPartner HUMINTpeople on site, fast and unverifiableThermal imagerywhere heat stopped being producedSatellite passesthe physical state of the structureAIS vessel trackingwhich carriers berthed, loaded and sailedAgreedindependentlyTrain identifiedDamage establishedINSIDE 72 HOURSA train that is down eventually shows up as a ship that does not sail.
No single line would have carried the decision. The partner’s people were fast and could not be checked. The imagery could not say what it meant on its own. The answer is where they agree.

Ras Laffan is the size of a town. “An energy facility” there could mean a switchyard, a storage tank, an office block or one of the liquefaction trains that turn gas into the cargo a ship carries away. A switchyard is a news item. A train is a supply interruption. Nothing in the early reporting said which one had been hit.

Our joint venture partner had people on the ground who said a train had been damaged. Human reporting is the fastest thing available and the hardest to act on by itself. The person telling you is rarely positioned to see the whole plant, and in a week like that one, everybody on site has heard something.

So we went after the things that cannot be talked into existence. Thermal imagery showed where heat had stopped being produced and where it had not. Successive satellite passes showed the physical state of the structure rather than the claim about it. AIS tracking showed which carriers berthed, which loaded and which left, and on what schedule, because a train that is down eventually shows up as a ship that does not sail.

The three agreed with each other and with what the partner’s people had said. Within seventy two hours of the first report the company had the train identified, the damage established, and a line of sourcing written beside each claim rather than a single confident sentence.

That was the difference that mattered. The company was not deciding whether to believe a rumour. It was deciding what to do about a fact it could show to its own board, and later to anyone who asked how it had known.

Human reporting told us where to look. It was the imagery and the ships that made it something the company could act on.